A plant, a machine, a process — shown as it is, with people who are not in the same building.
.SPACE / THE TOOL
You put a product, a layout or an idea into a shared 3D room. Then people look at the same thing — and talk about it there.
ENTER .SPACE ↗.SPACE is the working platform behind SKY•FORM. Keep assets, build scenes, walk them with others, and publish — on the web, at a desk, or in VR.
A plant, a machine, a process — shown as it is, with people who are not in the same building.
Campaigns, launches, stories. The product can be turned, opened and understood — not only pictured.
Options, colors, layouts. A customer can choose, save a setup, and leave with a clear picture.
Objects, rooms and ideas that belong to you. Kept in one space, ready when you want to look again.
Not a zip file. A scene someone can enter, sit with, and talk through with you.
Parts, sequences, warehouses. The people who build it can see the same model you are looking at.
The library is the work. The conversation stays with it.
Models, materials and scenes in one place. The same object can be reused, updated, and opened in an editor — so the library is the work, not a dump beside it.
Mark a file, talk next to it, change status, upload a new version. The conversation stays with the work — not in a side email.
Author choices on a 3D scene. A viewer tries options and colors in a branded overlay. Sales, marketing and customers can save a setup and come back to it.
A millimetre-accurate board beside the 3D view. Map conveyors, generate the layout, then simulate items moving along it.
Open a scene with your team. Present, follow, or edit together — everyone standing around the same model.
MAC / MENU BAR
The menu bar mark lists Drive, Connector, Space AI, and Plan. The installer lets you choose which of those apps to put on this Mac. Each one opens in its own window, with its own Dock icon. Not the App Store.